Design Review Early Design Guidance for a Major Phased Development for eleven buildings with 162,656 sq. ft. retail sales and service, 1,111,208 sq. ft. office, 250,100 sq. ft. sports and recreation and 205,000 sq. ft. hotel. Parking for 2,708 vehicles proposed. Some existing structures and surface parking to be demolished.
Design Review Early Design Guidance for 4, 6 to 8-story buildings with 1,164 apartments, 25 live-work units, and retail. Parking for 1,346 vehicles proposed. Existing structures to be demolished.
Land Use Application to allow a 7-story, 268-unit apartment building with retail. Parking for 437 vehicles proposed. Early Design Guidance Review conducted under 3032291-EG.
Land Use Application to allow a 7-story, 186-unit apartment building with retail. No parking proposed. Existing buildings to be demolished. Early Design Guidance Review conducted under 3032291-EG.
Land Use Application to allow an 8-story, 280-unit apartment building with 14-live-work units and retail. Parking for 317 vehicles proposed. Existing buildings to be demolished. Early Design Guidance Review conducted under 3032291-EG.
Land Use Application to allow a 9-story, 234-unit apartment building with retail. Parking for 569 vehicles proposed. Existing buildings to be demolished. Early Design Guidance Review conducted under 3032291-EG.
Land Use Application to allow a major phased development with 12 new buildings. Project includes an indoor participant sports facility (NHL), office, retail, restaurants, and hotel. Parking for 2,818 vehicles proposed. Existing buildings to be demolished. Five buildings to remain.
Phased construction: Construct residential retail and parking structure and occupy per plan (includes excavation and shoring foundation structure to grade and base structure).
Parcel numbers, lot sizes, assessed values and zoning
15 parcels
What is inside the buildingPro
Floor areas from 5 of the 16 permits
35 areas
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each
ContactsPro
The owner, the financially responsible party, the developer, the architect, the landscape architect, the structural engineer, the civil engineer and the geotechnical engineer