Two former school sites anchor Renton's development pipeline right now. 16426 128th Ave SE covers 37.25 acres and was filed May 27, 2026, zoned R-6 for residential development. Closer to downtown, 400 S 2nd St covers 23.23 acres in the Tobin plat, filed July 15, 2026, with commercial and institutional zoning. BuildVue's parcel data lists both sites' previous use as School, Public. Neither has a construction start date on record yet, and both remain in land use review.

As of July 29, 2026, BuildVue's Renton page was tracking 12 construction and development projects across the city, sourced daily from the City of Renton GIS. Two of the 12 were under construction, nine were in land use review, and one had been withdrawn.

Renton at a glance, July 29, 2026

MetricValue
Total tracked projects12
Residential unitsNot published
Est. construction value$9M

The projects BuildVue is tracking in Renton

AddressTypeStageValueFiled
5200 Talbot Rd SCommercialUnder construction$10KDec 2025
856 Harrington Ave NEResidentialUnder construction$10KJun 2026
2820 NE 11th StResidentialLand use review$1.4MFeb 2026
2822 NE 11th StResidentialLand use review$1.4MFeb 2026
2824 NE 11th StResidentialLand use review$1.4MFeb 2026
2832 NE 11th StResidentialLand use review$1.6MFeb 2026
2834 NE 11th StResidentialLand use review$1.6MFeb 2026
2905 NE 11th StResidentialLand use review$1.1MFeb 2026
16426 128th Ave SEResidentialLand use review$14KMay 2026
205 Sunset Blvd NCommercialLand use review$213KMay 2026
400 S 2nd StCommercialLand use review$661KJul 2026
1322 Tacoma Ct NEResidentialWithdrawnNot recordedJul 2026

Figures above are as of July 29, 2026, pulled from each project's own record on BuildVue. The five NE 11th Street filings on the shared 1.73 acre parcel add up to about $8.5M, most of Renton's $9M citywide estimated construction value. The withdrawn filing at 1322 Tacoma Ct NE is the only one of the 12 with no recorded value.

A cluster of filings in Renton Highlands

Six of the 12 projects sit on NE 11th Street in Renton Highlands, and they group into two sites. 2824 NE 11th St and four addresses around it, 2820, 2822, 2832, and 2834 NE 11th Street, share the same 1.73 acre parcel. BuildVue's parcel data lists that parcel's previous use as Apartment. The five filings on it were submitted between February 6 and February 12, 2026. A sixth filing at 2905 NE 11th Street sits on a neighboring 1.30 acre parcel, also listed with a previous use of Apartment, filed February 9. All six remain in land use review, and recorded values for each are in the table above.

Two projects under construction

Only two Renton filings have moved past land use review. 5200 Talbot Rd S is a commercial project on a 6.17 acre site filed in December 2025. BuildVue's parcel data lists that site's previous use as Church, Welfare, Religious Service. 856 Harrington Ave NE is a much smaller residential project on a 0.15 acre lot, filed in June 2026. BuildVue's parcel data lists that lot's previous use as a fourplex.

The one withdrawal on record

NEWSLETTER

Get a monthly newsletter with new features plus Seattle Metro construction activity. No spam.

A filing at 1322 Tacoma Ct NE was withdrawn in July 2026. The lot is part of a platted development called Towns on 12th. It is the only withdrawal currently on record among Renton's 12 tracked filings.

See it on the map

Every address, permit stage, and filing date on this list comes from the Renton projects page. Federal Way, southwest of Renton, runs a smaller pipeline weighted toward commercial filings, covered in What's Being Built in Federal Way.

Frequently asked questions

How many projects is BuildVue tracking in Renton?

BuildVue's Renton page listed 12 tracked projects as of July 29, 2026, with an estimated construction value of $9M across the pipeline. Two were under construction, nine were in land use review, and one had been withdrawn.

What is the biggest project moving through Renton right now?

By land area, the largest is a 37.25 acre former school site at 16426 128th Ave SE, filed in May 2026. A second former school site, 23.23 acres at 400 S 2nd St near downtown, is close behind. Both remain in land use review.

Is Renton building more housing or commercial space?

Of the 12 tracked filings, nine are residential and three are commercial. Six of the nine residential filings are the cluster of land use applications on NE 11th Street in Renton Highlands.

Where can I check the current stage of a specific Renton permit?

Each Renton project record linked in this post carries its own filed date, zoning code, and permit stage, pulled from the City of Renton GIS feed that updates daily.

WHY BUILDVUE

See the projects behind this article

BuildVue tracks development permits across two dozen cities around Puget Sound. Every project in this article is on the live map with its full permit history.

What the paid plans include
  • Full project details. Contacts, sales history, the building program, and the full permit record.
  • Alerts. Daily email alerts for followed projects and saved searches.
  • Portfolios. Every past and current project from each developer and architect.
  • Trends. Market statistics and neighborhood totals.
  • Exports. Any filtered list as a spreadsheet.
  • Assistant. Answers about the data in plain words.

Plans start at $29 a month. Every account begins with a free 14 day trial of Pro. No card needed.

Tags

rentoncitiesmultifamilycommercialdata2026

Related