Construct new 466SF Studio DADU above new 466SF garage and carport. Includes plumbing and mechanical per plans. ***FRR23-0207 APRPOVED 7/20/2023: It was discovered that the high voltage power lines are at the rear property line and require 14 feet clearance, measured at 7’-6” from the property line. The power lines are between 28 feet and 30 feet above finish grade at the alley, approximately one foot into the alley. See the south elevation for a diagram defining the clearance required and our design adjustment to accommodate this. In addition the building has been relocated in order to maximize the space between the existing house and new structure, as an existing addition on the rear of the home was discovered after the permit was awarded. See the site plan. To address the change in the roof, the structural plans and building section have been revised. Pre-Engineered roof trusses will be used in conjunction with stick framing beyond the bearing wall.*** **10/19/2023 FRR23-0307 APPROVED - Pour 527.5 SF of concrete in the highlighted areas in the attached document. Broom finish concrete which is minimum 4inches thick, we will also use #3 Rebar every 2 feet on center. Below will be a 4inch gravel base of 5/8 minus, which will be compacted.** **FRR23-0377 (12.28.23): Field Revision to modify stair to address exiting grade disparities** ***FRR24-0192 APPROVED 9/13/2024 - Revision to add washer, dryer, and utility sink to garage.***
Submitted Apr 19, 2023Issued Sep 16, 2024Finaled Jan 17, 2025
Permit data from City of Tacoma
The full record
3 sections · with Pro
More about 1011 N Prospect St Unit B
The land and its zoningPro
Parcel numbers, lot sizes, assessed values and zoning
1 parcel
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each