Issaquah · TalusIssaquah neighborhoods TalusArea map · 48 locations
Construction projects in Talus, Issaquah
48 PROJECTS · 3 ACTIVE
48
Projects
3
Active
53
Residential units
$22M
Est. value
4
Avg. stories
Projects by stage
- Land use36%
- Complete4594%
What’s being built
3 active- Residential2projects
9 units
- Commercial1project
New projects by year
Notable projects
Largest projects
BY EST. VALUE2119 NW Lynx Loop
Talus
Complete- Residential
- Single Family
$650KEst. value
1Unit
2113 NW Lynx Loop
Talus
Complete- Residential
- Single Family
$650KEst. value
1Unit
2125 NW Lynx Loop
Talus
Complete- Residential
- Single Family
$650KEst. value
1Unit
548 Viewcrest Dr NW
Talus
Complete- Residential
- Single Family
$634KEst. value
1Unit
540 Viewcrest Dr NW
Talus
Complete- Residential
- Single Family
$634KEst. value
1Unit
Active in Talus
ALL PROJECTSDevelopers
- Talus 7&8 Investment2 projects
Recent activity
LATEST PROJECTS- 161 Shangri-LA Way NWTALUS 9 TOWNHOMES - FINAL PLAT Final plat based on approved Preliminary Plat PP14-000019 units
- 7303 Renton-Issaquah Rd SELocal Access Street Section - AAS Single family plat development
- 7317 Renton-Issaquah Rd SETALUS STORAGE YARD MINERAL BIN COVER The Talus Storage Yard was constructed in 2009 as part of the Talus Development Agreement. The purpose was to provide an area to store sand stockpiles for snow response to the Talus Community. This site reduces travel time for the plow trucks to refill with sand and deicer. To prevent the sand from freezing, tarps are used to cover the stockpiles to keep it dry and useful for sanding operations. A Capital Improvement Plan was developed for the site in 2015 to cover the mineral bins by constructing a steel framed fabric building. Originally funded for construction in 2019 but the bids came in over budget. The building was purchased with plans to combine the construction with a similar CIP for the Public Works facility. COVID budget cuts halted the project for the next several years. Funding was available in 2022 but we failed to complete the project. Funding was carried over to 2023 an increased to cover both projects, permitting and engineering. An RFQ went out early March for engineering services to assess the existing ecology block walls and provide calculations and drawings to strengthen them as a foundation for the buildings. The permit application will be updated when the foundation drawings are available.
- 1929 NW Talus DrMIDDLE SCHOOL NO. 6 - BUILDING PERMIT 1 EXPEDITED***Construction of a new 136,059 sf middle school building including classrooms, library, commons and cafeteria, administration support spaces and service support including a loading dock and service yard. The building is separated into two buildings the building to the north (Building A) is Construction Type IIA and the building to the south (Building B) is Construction Type IIB. The building is 4-story with 2 basement levels. A stand-alone parking garage will be submitted in a separate permit.4 stories
- 548 Viewcrest Dr NWTALUS 7 & 8 LOT 11 PLAN 4880 Build a single family home1 unit
Nearby neighborhoods
Explore all Talus projects on the map
Use BuildVue's interactive map to filter and track construction projects in Talus and across Issaquah.
Permit data from MyBuildingPermit