Millwright District, Waterfront Place is among the largest projects BuildVue lists for Everett, a development at 800 Millwright Loop North recorded at an estimated $75.3 million. It is in land use review, the earliest stage BuildVue tracks. The permit was filed in March 2024 and the city has been reviewing it for more than two years.
As of July 29, 2026, BuildVue's Everett page lists 28 total projects and an estimated $332 million in construction value across them. Unit counts are not part of Everett's published city totals.
BuildVue's project records for Everett, the same data behind its map, count 13 commercial projects and 14 residential ones. One more project, a withdrawn permit, has no project type on record, for 28 in total. By stage, 14 have an active construction permit, 12 are in land use review, 1 is complete, and 1 was withdrawn, as of July 29, 2026.
Where the activity concentrates
Port Gardner has the most active projects in Everett, with 11 on BuildVue's count. Bayside and Northwest Everett each have 5, and Holly has 4. Cascade View, Glacier View, South Forest Park, Twin Creeks, View Ridge Madison and Westmont each have 2, and Delta and Riverside each have 1.
The named projects in the pipeline
The addresses, stage and value below come from BuildVue's project records as of July 29, 2026 evening Pacific. These figures change as permits are filed, reviewed and closed, so a later visit to buildvue.co/everett may show different numbers.
| Address | Project | Neighborhood | Stage | Est. value |
|---|---|---|---|---|
| 800 Millwright Loop N | Millwright District, Waterfront Place | Northwest Everett | Land use review | $75.3M |
| 3111 Wetmore Ave | Mosaic Apartments | Port Gardner | Construction | $24.9M |
| 2609 Wetmore Ave | Kōz on Wetmore | Bayside | Construction | $20.1M |
| 2914 Rucker Ave | The Wave | Port Gardner | Construction | $19.3M |
| 3700 Federal Ave | Jackson Elementary School | Port Gardner | Construction | $15.9M |
| 3332 Broadway | Compass Health Broadway Campus Phase 3 | Port Gardner | Land use review | $14.7M |
Apartments moving through construction
Three named apartment projects have active construction permits. Mosaic Apartments at 3111 Wetmore Avenue is under construction with a recorded value of $24.9 million. A few blocks away, Kōz on Wetmore at 2609 Wetmore Avenue is under construction at a recorded value of $20.1 million. The Wave at 2914 Rucker Avenue is also under construction, recorded at $19.3 million. All three are in the Port Gardner or Bayside areas near the waterfront. Each one is listed with its address, stage, and estimated value.
Schools and health care in the mix
Jackson Elementary School and Compass Health Broadway Campus Phase 3 round out the named projects in Everett's pipeline. Jackson Elementary School, at 3700 Federal Avenue, holds an active construction permit recorded at $15.9 million. Compass Health Broadway Campus Phase 3, at 3332 Broadway, is in land use review, recorded at $14.7 million, and its name marks it as one phase of a longer running health campus project.
