The proposed project involves replacing the failing retaining wall and deteriorating concrete stairs in a similar footprint to provide safe access to the Stromberg SFR. The existing 5-foot-tall creosote-treated timber retaining wall was constructed around 1928, to stabilize the steep slope leading to the residence. The SFR is located approximately 10 feet from the top of the steep slope. The retaining wall is in an advanced state of deterioration, its condition indicates that the wall is nearing the end of its service life and no longer provides reliable slope stabilization. The project proposal includes replacing the existing deteriorating creosote-treated timber wall with a soldier pile design, setback approximately ten feet from Vashon Highway SW. The project will employ auger cast soldier piles with lagging to provide long-term structural stability, and to be minimally impactful to the slope and existing vegetation while maintaining safe access for the owners to their home. The sole access to the residence is provided by a deteriorating concrete stairway extending directly from Vashon Highway SW. The property is bordered by County-owned land and a private parcel, leaving no alternative access route. To maintain safe access, the concrete stairs will be replaced. A timber stair and landing will be added at the base to accommodate the setback retaining wall. All work will be conducted from the upland on the landward side of Vashon Highway SW.