Allura at Tiffany Park - The applicant requested SEPA Environmental Review and Preliminary Plat approval for a 98-lot subdivision on November 14, 2013. The Planning Division of the City of Renton accepted the above master application for review on November 25, 2013. During our review, staff determined additional information was necessary in order to proceed. On December 16, 2013 the project was placed on hold pending receipt of a Habitat Data Report and Independent Secondary Review of the provided Critical Area Report and Traffic Study. The applicant has submitted all necessary information in order to proceed.
The applicant has submitted a revised proposal requesting SEPA Environmental Review and Preliminary Plat approval for a 97-lot subdivision. The 21.7 acre site is located within the Residential-8 dwelling units per acre (R-8) zoning classification. A small portion of the site located within the R-4 zoning classification. All proposed lots would be located within the R-8 zoning classification. The subject property is located at the dead end of SE 18th St bordered by the Cedar River Pipeline along the southern property line and Mercer Island Pipeline along the eastern property line. The 97 lots would result in a density of 5.70 dwelling units per acre. Lot sizes would range from 4,500 square feet to 8,456 square feet with an average lot size of 5,399 square feet. In addition to the 97 lots, 13 tracts are proposed for sensitive areas, tree retention, storm drainage, access, pedestrian connections, and open space including an (existing) vegetated buffer along the northern boundary 10-feet in width. Access to the site would be gained from SE 18th St with secondary access extended from 124th Pl SE. The site is currently vacant with 1,305 significant trees and the applicant is proposing to retain 147 trees. A stormwater detention vault is proposed which would discharge into an existing wetland on the site. The applicant has submitted a Wetland Report, Drainage Report, Traffic Impact Analysis, Geotechnical Engineering study, Arborist Report, Habitat Data Report, and Independent Secondary Studies for Transportation and Wetlands with the application. Access to the site would be gained from SE 18th St with secondary access extended from 124th Pl SE. Internal residential access streets are proposed to provide access to each lot. The site contains three Category 2 wetlands (Wetlands A, C, and, D) and two Category 3 wetlands (Wetland B and E). The applicant is proposing wetland buffer reductions in the amount of approximately 8,000 square feet to be mitigated with buffer additions in the amount of approximately 48,000 square feet. The applicant is also requesting a Critical Area Exemption for the extension of SE 18th St through portions of the buffer associated with Wetland E.
December 16, 2013 - Project placed on hold pending receipt of supplemental information to be provided by the applicant.
July 25, 2014 – The project was taken off hold.
August 20, 2014 - Project placed on hold pending receipt of supplemental information to be provided by the applicant.
September 5, 2014 - Project was taken off hold.
October 10, 2014 - Two SEPA appeals received.