LWHS - ALTERATION AND ADDITION TO BUILDING III. THE SCHOOL WILL REMAIN OPERATIONAL THROUGHOUT THE CONSTRUCTION PHASE. PROJECTED STUDENT POPULATION IS NOT PROPOSED TO INCREASE WHEN PROJECT COMPLETES. SITE PREPARATION INCLUDES DEMOLITION OF EXISTING PAVING AND LANDSCAPING, RELOCATION AND EXTENSION OF UNDERGROUND UTILITIES, ADDED STORM WATER DETENTION, SITE HYDRONIC PIPING, SITE LIGHTING REVISIONS, NEW PAVING AND LANDSCAPING, NEW SITE FENCING ALONG THE EAST AND WEST COURTYARDS, AND ADDITION OF A SECURE PEDESTRIAN WALKWAY BETWEEN COMMONS AND GYM. ALTERATION WORK WILL TAKE PLACE IN THE AUXILIARY GYMNASIUM AS ADDITIVE ALTERNATE SCOPE. WORK WILL INCLUDE EXPANDING THE EXISTING LOCKER ROOM CAPACITY. ADDITION WORK WILL CONSIST OF CONSTRUCTING APPROXIMATELY 20,000 SF OF NEW AREA NORTH OF THE EXISTING GYM. THE NEW ADDITION INCLUDES A GYMNASIUM, RESTROOMS, AND STORAGE. THE STRUCTURAL SYSTEM IS STEEL COLUMNS, BEAMS AND ROOF JOISTS; METAL STUD WALL FRAMING; AND CONCRETE SLAB ON GRADE. EXTERIOR MATERIALS ARE BRICK VENEER, ALUMINUM STOREFRONT GLAZING, AND CURTAINWALL FRAMING WITH INSULATED METAL PANEL INFILL. SOME EXISTING PARKING WILL BE DEMOLISHED FOR THE NEW CONSTRUCTION, AND NEW PARKING WILL BE ADDED IN PLACE OF THE PORTABLES. REMOVAL AND REPLACEMENT OF PARKING STALLS HAS BEEN REVIEWED AND APPROVED UNDER A PREVIOUS MASTER PLAN SUBMITTAL (ZON18-00783). See LSM20-01021 for grading and underground utilities.
Submitted Mar 18, 2020Issued Jul 14, 2020Finaled Feb 22, 2022