COMM ADDITION - Redmond High School - 2021 IBC - Project follows a separately permitted demolition phase with a two story addition with the school's main office and counselling office areas, ten (10) general purpose classrooms, two (2) full size music classrooms, smaller music program support rooms, accessory spaces, and modifications to achieve the addition. Additionally, a new mezzanine has been added over the cafeteria that connects the 2nd floor of the existing building. The addition of the mezzanine comes with a reclassification of the construction type of portion of the school with the gym and cafeteria from II-A to II-B and converts 2 existing walls as a part of achieving this. - Total area of construction = 37,597 SF