E26-49775 Bin Hu Residence Foundation Stabilization Emergency structural foundation stabilization of an existing single-family residence due to active settlement and structural instability. Scope of work includes urgent installation of (8) 2-inch diameter pipe piles along the front perimeter foundation per geotechnical recommendation to prevent further damage, stop continued settlement, and protect life safety ahead of the wet winter season while permanent foundation stabilization design and full stamped permit plans are being finalized.