This work is for the Lakewood Water District to construct a booster pump station building for the installation of booster pumps. This consists of the installation of a foundation for the pre-engineered metal building. Inside the building we will be installing one vertically suspended centrifugal pump, also termed "vertical turbine pump" and ancillary equipment, installation of two end suction centrifugal pumps and ancillary equipment. The building will have an HVAC installed, and electrical.