Existing 1725 SF single-family home will be demolished. On the site seven (7) townhouses will be built with the first floor elevated 4 feet above the average site elevation to accommodate the flood water flow through the property. 6 of the townhouses will be two-story, 3-bdr/1.5 bath and one will be 2-story, 3-bdr/2 bath with the first floor fully accessible. Building 2 will have three (3) of the overall project's 7 townhouses, and will face the alley. Seven parking spaces will be located off the alley at the north side of the property. Trash and recycling will also be located off the alley. Off-site improvements include curb, gutter and sidewalk on Janet street and a revised radius at the intersection of Janet and 2nd. The alley will also receive asphalt paving. Minimal concrete foundations at porches and utility access only. Building will be installed on raised steel pin piles. On-site walkways, parking and alley will be porous asphalt and/or concrete.
Submitted Oct 26, 2020Issued May 18, 2021Finaled Jun 7, 2023
Permit data from the City of North Bend Citizens Connect permit portal