Conversion of unfinished basement into an ADU. Includes removal of existing non-structural walls, plumbing, and hotwater heater. The new ADU includes 2-bedrooms, 1.5 bath, with new interior walls, a new kitchen, and supporting spaces. This permit also includes the remodel of the exterior existing deck, started under permit #: ENV851. The remodel of the deck includes demolishing the old rotting materials and replacing the deck in the same shape, size, and layout as it exists, just with new materials. Related Permit: ENV851.