DETACHED GARAGE CONVERSION TO DADU INCLUDES PLMB/MECH PER APPROVED PLANS **FRR24-0096 (04/12/24): Revised location of sewer line** ***FRR24-0092 1. Changed heating type to electric resistance heater plus heat pump in main living area, while maintaining 3 credit home energy requirement. Changed water heater to remove heat pump specification. Specified that existing concrete slab next to DADU will be replaced by ¾” minus grave *** ***FRR24-0079 APPROVED 4/15/2024: BUILDING PLANS HAVE BEEN REVISED, REMOVED EAST FACING WINDOW FROM THE WALL FACING THE EXISTING HOUSE. MOVED HEAT PUMP BETWEEN EXISTING HOUSE AND DADU. MOVED 10,000 BTU UNIT TO NEW LOCATION UNDER WINDOW. ELEVATIONS SHOW TRANSOM WINDOW REMOVED. SITE PLAN HAS BEEN UPDATED TO SHOW A MINIMUM SPACE OF 5 FT FROM THE EXISITING HOUSE TO THE DADU. SITE PLAN WAS REVISED TO SHOW WATER AND SEWER LINES TO GO AROUND EXISITNG HOUSE.*** **FRR24-0124 (05.16.24): revision to site plan, fire rating, window updates** **FRR24-0136 (06/11/24): see revisions 7 cover letter** **FRR24-0155 (07/24/24): Revisions to wall above stairs, stairs, shower dimensions, and notes added to drawings** **FRR24-0172 (08/14/24): Removal of second story Window, pushing back second story wall, and addition of skirt board in stairs**