Addition of second story ADU onto existing single story garage. Includes plumbing and mechanical per approved plans. ***FRR25-0066 APPROVED 04/04/25 Foundation is not suitable for further progress. I am asking for a plan revision with 4 post's being added to the garage, please see revamped plans.*** *** Field Revision 2: FRR25-0228 APPROVED_12.9.25_ STRUCTURAL.pdf plans for stairwell. The proposed plan will be option 2 were the footing will be 4 Ft. wide vs the proposed width of the deck. also the building got taller because of the headers in garage. The engineering truss came with a 2 X 12 instead of a 2 X 10 and the estimated height of the building got tall by 4 to 5 inches.