Create attached ADU at existing heated area of SFD, in an existing room, add a kitchen space, add kitchen sink, add dishwasher, add induction cooktop and associated vent, add appropriate cabinetry and refrigerator (no water line) to create a functional kitchen. Move existing gas hot water heater 15ft. along same wall, and replace existing carpet with tile.