Applicant is requesting Environmental Review, a Shoreline Conditional Use Permit, and a Shoreline Substantial Development Permit for the construction of a new 65-ft. long dock and installation of a pre-manufactured, freestanding, portable, marine grade aluminum boatlift in association with an existing single family residence on the shore of Lake Washington. The site is a 4,549 sf lot in the R-8 zone. Pier construction will be accomplished by driving eight 4-inch diameter galvanized steel piles via barge mounted drop hammer pile driving system. Boatlift assembly will be done with common hand tools.