REBUILD SFR ON EXISTING FOUNDATION Home burned down in December 2022. Bob would like to rebuild it as close as possible to the original structure, with a few minor changes. Existing foundation to be re-used, with five interior footings moved to add another floor beam below the kitchen area. 5/12 pitch on gable roofs, one main roof covering the house and back patio and another gable roof covering the garage. Small gable covering new bump-out in living room on front of house. Framing to be 2x6 exterior walls and 2x4 interior walls. Trusses spanning both house roof and perpendicular garage roof, to be engineered by truss company. All materials and design to meet or exceed fire safety codes.
NEW RESIDENCE The previous home burned down. We are going to have Coval Homes build one of their existing single story homes (Alderwood model) on the existing lot. I have contacted Lake Haven water and they said there's an existing water meter that is ready to be turned on. 
There is a foundation and garage floor from the previous home that will be removed.