| PIN | Address | Sq ft | Assessed | Zoning |
|---|---|---|---|---|
| 9323600390 | – | – | – | – |
EXT 4/2/24 KB. Underground horizontal directional boring using surface launched drill to install 2" Comcast conduit to 5500. Starting at Comcast pedestal located near SW corner of 5530's property, crew will bore in city row along E side of sidewalk running parallel with Highland Dr NW/N approx 38' to a placed 10" circular handhole, NW/N approx 52' to another 10" circular placed handhole and NW/N approx 44' to an existing handhole on N side of 5500's driveway. Route will finish on private property E/S approx 38' to 5500's connection. Potholing on Highland Dr is not needed for project. Handdigging over sewer later lines will occur. 7' of horizontal clearance between existing handhole/bore path and storm main will be kept.
Synced from City of Bellevue
| Date | Parcel | Price | Buyer | Seller | Excise # |
|---|---|---|---|---|---|
| — | — | Sales history | — | — | — |