Pothole utilities in various locations within site B to gather data for a future AC water main replacement project. A 12 Inch x 12 Inch square will be cut into hardscape, and the utility will be potholed using a vacuum truck hydro excavating. Backfill will include compacted 5-8 minus and EZ street cold patch for temporary surface restoration. Bravo will return to the potholes and patch per RC-220-01.