1. REMOVE AND DISPOSE OF THE EXISTING EXTERIOR STAIRS INCLUDING STAIR TREADS, LANDING, RAILINGS AND STRUCTURE. 2. INSTALL NEW STAIR PRECAST CONCRETE TREADS AND LANDINGS OVER NEW STRUCTURE PER STRUCTURAL. 3. INSTALL NEW WOOD STRUCTURE TO SUPPORT STAIRS AND STAIR LANDINGS. 4. MODIFY AND INSTALL NEW ASPHALT AT THE BASE OF STAIRS AS INDICATED.
Submitted Nov 19, 2025
Permit data from City of Bellevue
The full record
4 sections · with Pro
More about 3990 129th Pl SE - Bldg C
The land and its zoningPro
Parcel numbers, lot sizes, assessed values and zoning
1 parcel
What is inside the buildingPro
Floor areas from 1 of the 1 permit
1 area
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each