We are proposing to develop the site with a 4362 s.f. two story structure (single family residence) with a 750 s.f. attached 3-car garage. The existing structure on the site is to be demolished. This 9907 s.f. site contains 1118 s.f. of steep slope critical area at the northwest corner of the lot. The project geotechnical engineer is Earth Solutions NW, and they have prepared a Geotechnical Evaluation and Critical Areas Report that concludes the steep slope is a stable rock formation that requires a fifteen-foot slope buffer. As the site is mapped as an Infiltration Infeasibility Area, we are proposing to use the Alternative Impervious Surface which allows a maximum of 50% impervious surface on sites. We are proposing modification to the required setbacks according to LUC 20.25H.040 which allows a 15-foot rear yard setback and two 5-foot side yard setbacks on sites that contain critical areas., 25-105028 LO
Submitted Jul 27, 2026
Permit data from City of Bellevue
The full record
3 sections · with Pro
More about 5020 155th Pl SE
The land and its zoningPro
Parcel numbers, lot sizes, assessed values and zoning
1 parcel
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each