Traffic Control to perform work and modifications to the Wireless communications facility (WCF) within the ROW under Land Use approval per permit 22 117105 CA (description provided) Pole: Replace antenna shroud with a new 5 x 15 shroud, replace (3) antennas, add (3) antennas, add (2) HCS 2.0 Pendants with (2) 75-foot hybrid cable trunks, remove (6) TMAs, & remove (12) 7/8 coax, and relocate the existing GPS to the pole at 15-feet. Vault: Replace (2) cabinets, remove (3) FRLBs, remove (12) diplexers, remove existing 200A electrical panel. Ground: Add (1) new H-Frame, add (1) new 200A Emerson panel, add (1) Ciena, and add (2) new LED technician lights.
On PSE pole in ROW, T-Mobile proposes to replace antennas, cabinets and other equipment. Tower height and underground vault will increase. Project extended two months per pm request - CA