Construct a new S.F.R. on a vacant lot with an attached garage. Access to the site is via a driveway shared with Lot "B" immediately to the north. A soils report and arborist's report have been provided under this application. A project was previously proposed for Lot D. The critical areas consideration prepared by Jim Mattoon for Lot D has also been provided. All lost B C and D are contiguous with similar conditions. We would like approval of the proposed driveway located in t