- Demo Existing SFR- LBA to adjust exist lot line between 2 and 7- Develop both lots with new SFR+ADU including required parking. - Provide vehicle access easement across from (west) lot 2 to access rear (east) lot 7- Clarify status of ""Un-platted"" eastern most 30' area of the site.- Confirm ECA relief is not required for ECA Steep Slope"
- Demo Existing SFR- LBA to adjust exist lot line between 2 and 7- Develop both lots with new SFR+ADU including required parking. - Provide vehicle access easement across from (west) lot 2 to access rear (east) lot 7- Clarify status of ""Un-platted"" eastern most 30' area of the site.- Confirm ECA relief is not required for ECA Steep Slope"
Permit data from SDCI
The full record
2 sections · with Pro
More about 7508 58th Ave NE
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each