*Presidium Asset 8 (DADU): *Sprinklers Required* Construct one detached dwelling unit in the rear area of an existing single family lot. One new parking stall provided. 7.13.2024/Post Rev 1 - Revised Energy Credits. 8.9.2024/Post Rev 2
Gravel path on the west side of the DADU, concrete pedestrian pathway to the DADU required.
Submitted Dec 09, 2022Issued Aug 29, 2023Finaled Aug 26, 2024