E25-39806, Convert half bath into three quarters bath. Details and changes of the work are as follows. 1. Remove existing vanity and replace with walk in shower. Some plumbing work is needed to install drainage and inlet, rerouting work. 2. Remove existing cupboard and replace with new 30in vanity. Some plumbing work is needed to install drainage and inlet Notes are as follows: 1. This bathroom is located on the first floor (split level) next to the garage entrance. 2. There is an existing window. However, no windows or exterior walls are modified. Interior wall will have a few new holes to allow new pipes through. 3. No changes are done to existing toilet.
Submitted Aug 25, 2025Issued Sep 04, 2025
Permit data from MyBuildingPermit
The full record
3 sections · with Pro
More about 18434 129th Ln NE
The land and its zoningPro
Parcel numbers, lot sizes, assessed values and zoning
1 parcel
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each