Remove an existing pier (684 square feet) and demolish and existing boat cover (287 square feet). Construct a new pier (575 square feet). Install a new grated platform lift (144 square feet) and a new boat lift. Install two mooring piles. The new pier will be decked with ThruFlow grated decking with 42% open space. Remove a section of the existing bulkhead (28.6 lineal feet) to create a beach cove. Install 40 cubic yards of beach gravel in the cove. Plant native vegetation per the planting plan.
Demo and construction of new single family residence. Includes storm connection, right-of-way, clearing & grading. Does not include electrical (20-112456 BF) and mechanical (20-111553 BK). **Add on plumbing
Submitted Feb 08, 2019Issued Sep 11, 2019Finaled Mar 10, 2022