CONSTRUCT A GARAGE/SHOP AREA WITH SUPPORTING OFFICES, BREAK ROOM AND RESTROOMS. PRE-FABRICATED METAL BUILDING STRUCTURE WITH METAL FRAME AND METAL SIDING. **10/12/2023 - FRC23-0198 APPROVED: 1. CONSTRUCT A 2-HR DEMISING WALL IN THE INTERIOR OF THE BUILDING FOR DIVIDING IT FOR TWO TENANTS. THE BUILDING AREA TO THE NORTH OF THE DEMISING WALL WILL REMAIN AS A F-1/S-1 OCCUPANCY USED FOR STORAGE AS PREVIOUSLY PERMITTED. THE BUILDING AREA TO THE SOUTH OF THE DEMISING WALL WILL BE USED FOR A BASEBALL TRAINING AREA/BATTING CAGES AND THEREFOR BE CLASSIFIED AS AN A-3 OCCUPANCY - THE CODE ANALYSIS TABLES HAVE BEEN REVISED TO SHOW THIS. 2. RESTROOMS WILL ADDED TO BOTH SIDES OF THE WALL TO SERVE EACH AREA AS CALCUALTED IN THE CODE ANAYSIS. 3. AN OVERHEAD GARAGE DOORS ON THE WEST EXTERIOR WALL WILL BE RELOCATED AND MOVED APPROXIMATELY 50 FEET TO THE SOUTH. 4. AN ADDITIONAL EXIT DOOR WILL BE INSTALLED ON THE SOUTH WALL TO SERVE THE BASEBALL TRAINING/BATTING CAGE AREA.** **FRC24-0054 APPROVED: Install required bike storage on the outside of the building as shown in the attached drawings instead of inside of the building within the shop/warehouse 101***
Submitted Sep 20, 2021Issued Jul 12, 2023Finaled Jan 31, 2025