Unit C1 · CONSTRUCT (4) 3-STORY, 7962 SF (per drawings) VA -CONSTRUCTION, TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, (3.5) BATHROOMS, AND A SINGLE-CAR GARAGE.
THE FULL PROJECT SCOPE INCLUDES CONSTRUCTION OF (3) NEW RESIDENTIAL BUILDINGS FOR A TOTAL OF (12) NEW RESIDENCES ON A LANDLOCKED SITE BEHIND AN EXISTING OFFICE BUILDING. UNDER THIS SPECIFIC PERMIT IS (1) OF THE PROPOSED BUILDINGS, BUILDING B, WHICH CONSISTS OF (4) 3-STORY TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, (3.5) BATHROOMS, AND A SINGLE-CAR GARAGE. SITE WORK INCLUDES IMPROVEMENTS TO SHARED EASEMENT AREAS FOR ACCESS TO R.O.W., NEW SURFACE PARKING SPACES, NEW TRASH ENCLOSURE, AND NEW DRIVEWAY AND WALKING SURFACES AROUND PROPOSED BUILDING FOOTPRINT.
Unit B1 · Construct a new three-story four-unit 7551SF townhome building. Each townhome is 3BD/3.5BA with an attached garage. **Separate permits required for plumbing and mechanical scopes**
THE FULL PROJECT SCOPE INCLUDES CONSTRUCTION OF (3) NEW RESIDENTIAL BUILDINGS FOR A TOTAL OF (12) NEW RESIDENCES ON A LANDLOCKED SITE BEHIND AN EXISTING OFFICE BUILDING. UNDER THIS SPECIFIC PERMIT IS (1) OF THE PROPOSED BUILDINGS, BUILDING C, WHICH CONSISTS OF (4) 3-STORY TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, (3.5) BATHROOMS, AND A SINGLE-CAR GARAGE. SITE WORK INCLUDES IMPROVEMENTS TO SHARED EASEMENT AREAS FOR ACCESS TO R.O.W., NEW SURFACE PARKING SPACES, NEW TRASH ENCLOSURE, AND NEW DRIVEWAY AND WALKING SURFACES AROUND PROPOSED BUILDING FOOTPRINT.
Unit A1 · CONSTRUCT (4) 3-STORY, 7962 SF (per drawings) VA -CONSTRUCTION, TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, (3.5) BATHROOMS, AND A SINGLE-CAR GARAGE.
THE FULL PROJECT SCOPE INCLUDES CONSTRUCTION OF (3) NEW RESIDENTIAL BUILDINGS FOR A TOTAL OF (12) NEW RESIDENCES ON A LANDLOCKED SITE BEHIND AN EXISTING OFFICE BUILDING. UNDER THIS SPECIFIC PERMIT IS (1) OF THE PROPOSED BUILDINGS, BUILDING A, WHICH CONSISTS OF (4) 3-STORY TOWNHOMES. EACH NEW TOWNHOME TO CONSIST OF (3) BEDROOMS, (3.5) BATHROOMS, AND A SINGLE-CAR GARAGE. SITE WORK INCLUDES IMPROVEMENTS TO SHARED EASEMENT AREAS FOR ACCESS TO R.O.W., NEW SURFACE PARKING SPACES, NEW TRASH ENCLOSURE, AND NEW DRIVEWAY AND WALKING SURFACES AROUND PROPOSED BUILDING FOOTPRINT.