18703 108th Av E Lot 587
Graham, Pierce County, WA
- Residential
- Single Family
1 parcel · 182 permitsLast activity Jun 17, 2022
Permits
182 permits · 1 stage| Construction182 permits | ||||||
| 948969 | Finaled | Dec 2, 2020 | Jan 12, 2021 | May 24, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 2, 2020Issued Jan 12, 2021Finaled May 24, 2021 | ||||||
| 949006 | Finaled | Dec 3, 2020 | Feb 5, 2021 | Jun 15, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 3, 2020Issued Feb 5, 2021Finaled Jun 15, 2021 | ||||||
| 949013 | Finaled | Dec 2, 2020 | Jan 13, 2021 | Jun 3, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 2, 2020Issued Jan 13, 2021Finaled Jun 3, 2021 | ||||||
| 949095 | Finaled | Dec 3, 2020 | Mar 22, 2021 | Sep 14, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Dec 3, 2020Issued Mar 22, 2021Finaled Sep 14, 2021 | ||||||
| 949100 | Finaled | Dec 3, 2020 | Mar 22, 2021 | Aug 30, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 3, 2020Issued Mar 22, 2021Finaled Aug 30, 2021 | ||||||
| 949283 | Finaled | Dec 4, 2020 | Mar 22, 2021 | Sep 15, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 4, 2020Issued Mar 22, 2021Finaled Sep 15, 2021 | ||||||
| 949326 | Finaled | Dec 6, 2020 | Feb 9, 2021 | Jun 1, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 6, 2020Issued Feb 9, 2021Finaled Jun 1, 2021 | ||||||
| 949329 | Finaled | Dec 6, 2020 | Feb 8, 2021 | May 28, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 6, 2020Issued Feb 8, 2021Finaled May 28, 2021 | ||||||
| 949341 | Finaled | Dec 6, 2020 | Feb 10, 2021 | Jun 28, 2021 | $277K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 6, 2020Issued Feb 10, 2021Finaled Jun 28, 2021 | ||||||
| 949636 | Finaled | Dec 9, 2020 | Mar 22, 2021 | Sep 27, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Dec 9, 2020Issued Mar 22, 2021Finaled Sep 27, 2021 | ||||||
| 949668 | Finaled | Dec 23, 2020 | Feb 22, 2021 | Jul 22, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 23, 2020Issued Feb 22, 2021Finaled Jul 22, 2021 | ||||||
| 949790 | Finaled | Dec 13, 2020 | Feb 16, 2021 | Jul 2, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 13, 2020Issued Feb 16, 2021Finaled Jul 2, 2021 | ||||||
| 949848 | Finaled | Dec 13, 2020 | Mar 22, 2021 | Sep 29, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 13, 2020Issued Mar 22, 2021Finaled Sep 29, 2021 | ||||||
| 949866 | Finaled | Dec 13, 2020 | Feb 10, 2021 | Jun 16, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 13, 2020Issued Feb 10, 2021Finaled Jun 16, 2021 | ||||||
| 950223 | Finaled | Dec 16, 2020 | Mar 22, 2021 | Nov 1, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 16, 2020Issued Mar 22, 2021Finaled Nov 1, 2021 | ||||||
| 950326 | Finaled | Dec 16, 2020 | Feb 17, 2021 | Jul 1, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 16, 2020Issued Feb 17, 2021Finaled Jul 1, 2021 | ||||||
| 950337 | Finaled | Dec 16, 2020 | Feb 17, 2021 | Jul 1, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 16, 2020Issued Feb 17, 2021Finaled Jul 1, 2021 | ||||||
| 950359 | Finaled | Dec 16, 2020 | Mar 1, 2021 | Aug 30, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 16, 2020Issued Mar 1, 2021Finaled Aug 30, 2021 | ||||||
| 951217 | Finaled | Dec 30, 2020 | Mar 12, 2021 | Aug 12, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 30, 2020Issued Mar 12, 2021Finaled Aug 12, 2021 | ||||||
| 951221 | Finaled | Dec 30, 2020 | Mar 22, 2021 | Oct 10, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 30, 2020Issued Mar 22, 2021Finaled Oct 10, 2021 | ||||||
| 951501 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Nov 9, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Nov 9, 2021 | ||||||
| 951505 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 28, 2021 | $332K | D R HORTON Contractor |
Front Load - Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 28, 2021 | ||||||
| 951666 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Nov 8, 2021 | $357K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #863286 Front Load Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Nov 8, 2021 | ||||||
| 951686 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 20, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 20, 2021 | ||||||
| 951696 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 19, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 19, 2021 | ||||||
| 951810 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 16, 2021 | $212K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 16, 2021 | ||||||
| 951841 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Dec 8, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Dec 8, 2021 | ||||||
| 951950 | Finaled | Jan 7, 2021 | Apr 8, 2021 | Dec 13, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Apr 8, 2021Finaled Dec 13, 2021 | ||||||
| 951961 | Finaled | Jan 7, 2021 | Jan 27, 2021 | Sep 29, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Jan 7, 2021Issued Jan 27, 2021Finaled Sep 29, 2021 | ||||||
| 951969 | Finaled | Jan 7, 2021 | Apr 14, 2021 | Dec 20, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Jan 7, 2021Issued Apr 14, 2021Finaled Dec 20, 2021 | ||||||
| 952429 | Finaled | Jan 12, 2021 | Apr 16, 2021 | Mar 22, 2022 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan # 853931 Front Load Submitted Jan 12, 2021Issued Apr 16, 2021Finaled Mar 22, 2022 | ||||||
| 948862 | Finaled | Dec 3, 2020 | Jan 12, 2021 | May 7, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 3, 2020Issued Jan 12, 2021Finaled May 7, 2021 | ||||||
| 948962 | Finaled | Dec 2, 2020 | Feb 9, 2021 | Jun 15, 2021 | $278K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 2, 2020Issued Feb 9, 2021Finaled Jun 15, 2021 | ||||||
| 948972 | Finaled | Dec 2, 2020 | Feb 8, 2021 | Jun 10, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 2, 2020Issued Feb 8, 2021Finaled Jun 10, 2021 | ||||||
| 949026 | Finaled | Dec 3, 2020 | Mar 12, 2021 | Aug 5, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 3, 2020Issued Mar 12, 2021Finaled Aug 5, 2021 | ||||||
| 949060 | Finaled | Dec 3, 2020 | Mar 12, 2021 | Aug 17, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 3, 2020Issued Mar 12, 2021Finaled Aug 17, 2021 | ||||||
| 949074 | Finaled | Dec 3, 2020 | Feb 9, 2021 | Jun 17, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 3, 2020Issued Feb 9, 2021Finaled Jun 17, 2021 | ||||||
| 949081 | Finaled | Dec 3, 2020 | Feb 8, 2021 | Jun 16, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4w-bedroom Single Family Residence Base Plan #859309 Submitted Dec 3, 2020Issued Feb 8, 2021Finaled Jun 16, 2021 | ||||||
| 949087 | Finaled | Dec 3, 2020 | Feb 8, 2021 | Jun 11, 2021 | $319K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Submitted Dec 3, 2020Issued Feb 8, 2021Finaled Jun 11, 2021 | ||||||
| 949104 | Finaled | Dec 3, 2020 | Mar 18, 2021 | Sep 8, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 3, 2020Issued Mar 18, 2021Finaled Sep 8, 2021 | ||||||
| 949320 | Finaled | Dec 6, 2020 | Mar 12, 2021 | Aug 17, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 6, 2020Issued Mar 12, 2021Finaled Aug 17, 2021 | ||||||
| 949423 | Finaled | Dec 7, 2020 | Feb 9, 2021 | Jun 1, 2021 | $163K | D R HORTON Contractor |
Construct 2-story 3-bedroom Single Family Residence Base Plan #943123 Front Load Submitted Dec 7, 2020Issued Feb 9, 2021Finaled Jun 1, 2021 | ||||||
| 949440 | Finaled | Dec 7, 2020 | Feb 17, 2021 | Jul 14, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 7, 2020Issued Feb 17, 2021Finaled Jul 14, 2021 | ||||||
| 949518 | Finaled | Dec 8, 2020 | Feb 17, 2021 | Jul 16, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 8, 2020Issued Feb 17, 2021Finaled Jul 16, 2021 | ||||||
| 949626 | Finaled | Dec 9, 2020 | Mar 22, 2021 | Sep 23, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Dec 9, 2020Issued Mar 22, 2021Finaled Sep 23, 2021 | ||||||
| 949641 | Finaled | Dec 9, 2020 | Mar 22, 2021 | Oct 11, 2021 | $261K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853933 Front Load Submitted Dec 9, 2020Issued Mar 22, 2021Finaled Oct 11, 2021 | ||||||
| 949785 | Finaled | Dec 13, 2020 | Feb 10, 2021 | Jul 2, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Dec 13, 2020Issued Feb 10, 2021Finaled Jul 2, 2021 | ||||||
| 949813 | Finaled | Dec 13, 2020 | Mar 2, 2021 | Aug 26, 2021 | $319K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Submitted Dec 13, 2020Issued Mar 2, 2021Finaled Aug 26, 2021 | ||||||
| 949819 | Finaled | Dec 13, 2020 | Mar 2, 2021 | Aug 17, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 13, 2020Issued Mar 2, 2021Finaled Aug 17, 2021 | ||||||
| 949825 | Finaled | Dec 13, 2020 | Jan 22, 2021 | Aug 18, 2021 | $357K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #859313 Submitted Dec 13, 2020Issued Jan 22, 2021Finaled Aug 18, 2021 | ||||||
| 949857 | Finaled | Dec 13, 2020 | Mar 23, 2021 | Jun 18, 2021 | $261K | D R HORTON Contractor |
Construct 2-story 3-bedroom Single Family Residence Base Plan #853933 Front Load Submitted Dec 13, 2020Issued Mar 23, 2021Finaled Jun 18, 2021 | ||||||
| 950172 | Finaled | Dec 16, 2020 | Feb 22, 2021 | Aug 4, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 16, 2020Issued Feb 22, 2021Finaled Aug 4, 2021 | ||||||
| 950333 | Finaled | Dec 16, 2020 | Feb 17, 2021 | Jul 13, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 16, 2020Issued Feb 17, 2021Finaled Jul 13, 2021 | ||||||
| 950348 | Finaled | Dec 16, 2020 | Mar 1, 2021 | Aug 16, 2021 | $277K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 16, 2020Issued Mar 1, 2021Finaled Aug 16, 2021 | ||||||
| 950606 | Finaled | Dec 17, 2020 | Feb 22, 2021 | Aug 30, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 17, 2020Issued Feb 22, 2021Finaled Aug 30, 2021 | ||||||
| 950620 | Finaled | Dec 17, 2020 | Mar 10, 2021 | Jul 22, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 17, 2020Issued Mar 10, 2021Finaled Jul 22, 2021 | ||||||
| 950625 | Finaled | Dec 17, 2020 | Jan 15, 2021 | Dec 3, 2021 | $163K | D R HORTON Contractor |
Front Load - Construct 2-story 3-bedroom Single Family Residence Base Plan #943123 Submitted Dec 17, 2020Issued Jan 15, 2021Finaled Dec 3, 2021 | ||||||
| 951143 | Finaled | Dec 24, 2020 | Mar 11, 2021 | Aug 2, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 24, 2020Issued Mar 11, 2021Finaled Aug 2, 2021 | ||||||
| 951159 | Finaled | Dec 24, 2020 | Jan 24, 2021 | Sep 28, 2021 | $319K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Submitted Dec 24, 2020Issued Jan 24, 2021Finaled Sep 28, 2021 | ||||||
| 951171 | Finaled | Dec 24, 2020 | Mar 22, 2021 | Sep 28, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 24, 2020Issued Mar 22, 2021Finaled Sep 28, 2021 | ||||||
| 951204 | Finaled | Dec 30, 2020 | Mar 11, 2021 | Aug 4, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 30, 2020Issued Mar 11, 2021Finaled Aug 4, 2021 | ||||||
| 951229 | Finaled | Dec 30, 2020 | Mar 11, 2021 | Aug 11, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Dec 30, 2020Issued Mar 11, 2021Finaled Aug 11, 2021 | ||||||
| 951239 | Finaled | Dec 31, 2020 | Feb 2, 2021 | Dec 15, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 31, 2020Issued Feb 2, 2021Finaled Dec 15, 2021 | ||||||
| 951240 | Finaled | Dec 31, 2020 | Feb 2, 2021 | Oct 8, 2021 | $357K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #859313 Submitted Dec 31, 2020Issued Feb 2, 2021Finaled Oct 8, 2021 | ||||||
| 951493 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 13, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 13, 2021 | ||||||
| 951508 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Nov 9, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Nov 9, 2021 | ||||||
| 951537 | Finaled | Jan 7, 2021 | Mar 18, 2021 | Sep 3, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Mar 18, 2021Finaled Sep 3, 2021 | ||||||
| 951556 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 24, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 24, 2021 | ||||||
| 951631 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 29, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 29, 2021 | ||||||
| 951644 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 10, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 10, 2021 | ||||||
| 951689 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 11, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 11, 2021 | ||||||
| 951770 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Nov 15, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Nov 15, 2021 | ||||||
| 951774 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Nov 15, 2021 | $212K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Nov 15, 2021 | ||||||
| 951781 | Finaled | Jan 7, 2021 | May 4, 2021 | Nov 15, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Jan 7, 2021Issued May 4, 2021Finaled Nov 15, 2021 | ||||||
| 951804 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 15, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 15, 2021 | ||||||
| 951821 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 22, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 22, 2021 | ||||||
| 951833 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 24, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 24, 2021 | ||||||
| 951981 | Finaled | Jan 7, 2021 | Apr 14, 2021 | Dec 29, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Jan 7, 2021Issued Apr 14, 2021Finaled Dec 29, 2021 | ||||||
| 952111 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Feb 4, 2022 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Feb 4, 2022 | ||||||
| 952114 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Feb 10, 2022 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Feb 10, 2022 | ||||||
| 952308 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Feb 8, 2022 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Feb 8, 2022 | ||||||
| 948877 | Finaled | Dec 3, 2020 | Jan 12, 2021 | May 13, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 3, 2020Issued Jan 12, 2021Finaled May 13, 2021 | ||||||
| 948889 | Finaled | Dec 3, 2020 | Jan 14, 2021 | May 17, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 3, 2020Issued Jan 14, 2021Finaled May 17, 2021 | ||||||
| 950160 | Finaled | Dec 15, 2020 | Jan 19, 2021 | Aug 19, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 15, 2020Issued Jan 19, 2021Finaled Aug 19, 2021 | ||||||
| 950616 | Finaled | Dec 17, 2020 | Mar 15, 2021 | Aug 2, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Dec 17, 2020Issued Mar 15, 2021Finaled Aug 2, 2021 | ||||||
| 950853 | Finaled | Dec 21, 2020 | Mar 18, 2021 | Sep 29, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 21, 2020Issued Mar 18, 2021Finaled Sep 29, 2021 | ||||||
| 951226 | Finaled | Dec 30, 2020 | Mar 24, 2021 | Sep 29, 2021 | $278K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 30, 2020Issued Mar 24, 2021Finaled Sep 29, 2021 | ||||||
| 951528 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Sep 28, 2021 | $357K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #863286 Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Sep 28, 2021 | ||||||
| 951956 | Finaled | Jan 7, 2021 | Apr 14, 2021 | Dec 15, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Jan 7, 2021Issued Apr 14, 2021Finaled Dec 15, 2021 | ||||||
| 950148 | Finaled | Dec 15, 2020 | Jan 20, 2021 | Oct 29, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 15, 2020Issued Jan 20, 2021Finaled Oct 29, 2021 | ||||||
| 950184 | Finaled | Dec 16, 2020 | Feb 22, 2021 | Aug 9, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 16, 2020Issued Feb 22, 2021Finaled Aug 9, 2021 | ||||||
| 950341 | Finaled | Dec 16, 2020 | Feb 19, 2021 | Jul 20, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 16, 2020Issued Feb 19, 2021Finaled Jul 20, 2021 | ||||||
| 950464 | Finaled | Dec 16, 2020 | Mar 18, 2021 | Aug 25, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 16, 2020Issued Mar 18, 2021Finaled Aug 25, 2021 | ||||||
| 950577 | Finaled | Dec 17, 2020 | Feb 22, 2021 | Aug 23, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 17, 2020Issued Feb 22, 2021Finaled Aug 23, 2021 | ||||||
| 950599 | Finaled | Dec 17, 2020 | Feb 22, 2021 | Aug 27, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 17, 2020Issued Feb 22, 2021Finaled Aug 27, 2021 | ||||||
| 950638 | Finaled | Dec 17, 2020 | Mar 22, 2021 | Sep 24, 2021 | $277K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 17, 2020Issued Mar 22, 2021Finaled Sep 24, 2021 | ||||||
| 950647 | Finaled | Dec 17, 2020 | Apr 30, 2021 | Sep 16, 2021 | $278K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 17, 2020Issued Apr 30, 2021Finaled Sep 16, 2021 | ||||||
| 951146 | Finaled | Dec 24, 2020 | Mar 10, 2021 | Jul 26, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Dec 24, 2020Issued Mar 10, 2021Finaled Jul 26, 2021 | ||||||
| 951149 | Finaled | Dec 24, 2020 | Jan 24, 2021 | Nov 2, 2021 | $346K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #863034 Front Load Submitted Dec 24, 2020Issued Jan 24, 2021Finaled Nov 2, 2021 | ||||||
| 951152 | Finaled | Dec 24, 2020 | Mar 10, 2021 | Jul 20, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 24, 2020Issued Mar 10, 2021Finaled Jul 20, 2021 | ||||||
| 951177 | Finaled | Dec 24, 2020 | Mar 22, 2021 | Oct 4, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 24, 2020Issued Mar 22, 2021Finaled Oct 4, 2021 | ||||||
| 951207 | Finaled | Dec 30, 2020 | Mar 11, 2021 | Jul 15, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 30, 2020Issued Mar 11, 2021Finaled Jul 15, 2021 | ||||||
| 951210 | Finaled | Dec 30, 2020 | Mar 22, 2021 | Oct 8, 2021 | $319K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Submitted Dec 30, 2020Issued Mar 22, 2021Finaled Oct 8, 2021 | ||||||
| 951490 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 17, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 17, 2021 | ||||||
| 951496 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 23, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 23, 2021 | ||||||
| 951523 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Nov 19, 2021 | $389K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #866032 Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Nov 19, 2021 | ||||||
| 951635 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 21, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 21, 2021 | ||||||
| 951828 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 22, 2021 | $212K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 22, 2021 | ||||||
| 951848 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 30, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 30, 2021 | ||||||
| 951989 | Finaled | Jan 7, 2021 | Apr 14, 2021 | Dec 20, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Jan 7, 2021Issued Apr 14, 2021Finaled Dec 20, 2021 | ||||||
| 951944 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 18, 2021 | $212K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 18, 2021 | ||||||
| 952090 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Jan 12, 2022 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Jan 12, 2022 | ||||||
| 952095 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Jan 25, 2022 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Jan 25, 2022 | ||||||
| 951935 | Finaled | May 20, 2021 | Jun 15, 2021 | Dec 1, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted May 20, 2021Issued Jun 15, 2021Finaled Dec 1, 2021 | ||||||
| 949590 | Finaled | Dec 8, 2020 | Feb 19, 2021 | Jul 20, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 8, 2020Issued Feb 19, 2021Finaled Jul 20, 2021 | ||||||
| 950196 | Finaled | Dec 16, 2020 | Feb 22, 2021 | Aug 2, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 16, 2020Issued Feb 22, 2021Finaled Aug 2, 2021 | ||||||
| 950587 | Finaled | Dec 17, 2020 | Mar 29, 2021 | Nov 22, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 17, 2020Issued Mar 29, 2021Finaled Nov 22, 2021 | ||||||
| 951657 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Nov 8, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Nov 8, 2021 | ||||||
| 951788 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 12, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 12, 2021 | ||||||
| 949112 | Finaled | Dec 3, 2020 | Mar 12, 2021 | Sep 13, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Dec 3, 2020Issued Mar 12, 2021Finaled Sep 13, 2021 | ||||||
| 949077 | Finaled | Dec 3, 2020 | Feb 9, 2021 | Jun 16, 2021 | $278K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 3, 2020Issued Feb 9, 2021Finaled Jun 16, 2021 | ||||||
| 949411 | Finaled | Dec 7, 2020 | Feb 9, 2021 | Jun 1, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Dec 7, 2020Issued Feb 9, 2021Finaled Jun 1, 2021 | ||||||
| 949414 | Finaled | Dec 7, 2020 | Jan 13, 2021 | May 28, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 7, 2020Issued Jan 13, 2021Finaled May 28, 2021 | ||||||
| 949507 | Finaled | Dec 8, 2020 | Feb 10, 2021 | Jun 14, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 8, 2020Issued Feb 10, 2021Finaled Jun 14, 2021 | ||||||
| 949648 | Finaled | Dec 9, 2020 | Feb 19, 2021 | Jul 27, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 9, 2020Issued Feb 19, 2021Finaled Jul 27, 2021 | ||||||
| 949662 | Finaled | Dec 9, 2020 | Feb 19, 2021 | Jul 26, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 9, 2020Issued Feb 19, 2021Finaled Jul 26, 2021 | ||||||
| 949795 | Finaled | Dec 13, 2020 | Feb 22, 2021 | Aug 3, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 13, 2020Issued Feb 22, 2021Finaled Aug 3, 2021 | ||||||
| 949809 | Finaled | Dec 13, 2020 | Feb 22, 2021 | Aug 10, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 13, 2020Issued Feb 22, 2021Finaled Aug 10, 2021 | ||||||
| 949919 | Finaled | Dec 15, 2020 | Feb 10, 2021 | Jul 9, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 15, 2020Issued Feb 10, 2021Finaled Jul 9, 2021 | ||||||
| 949056 | Finaled | Dec 3, 2020 | Mar 12, 2021 | Aug 6, 2021 | $223K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Front Load Submitted Dec 3, 2020Issued Mar 12, 2021Finaled Aug 6, 2021 | ||||||
| 949069 | Finaled | Dec 3, 2020 | Feb 9, 2021 | Jun 7, 2021 | $261K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #853933 Front Load Submitted Dec 3, 2020Issued Feb 9, 2021Finaled Jun 7, 2021 | ||||||
| 950210 | Finaled | Dec 16, 2020 | Mar 22, 2021 | Nov 12, 2021 | $163K | D R HORTON Contractor |
Construct 2-story 3-bedroom Single Family Residence Base Plan #943123 Front Load Submitted Dec 16, 2020Issued Mar 22, 2021Finaled Nov 12, 2021 | ||||||
| 950344 | Finaled | Dec 16, 2020 | Feb 19, 2021 | Jul 14, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Dec 16, 2020Issued Feb 19, 2021Finaled Jul 14, 2021 | ||||||
| 950349 | Finaled | Dec 16, 2020 | Feb 19, 2021 | Jul 19, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Dec 16, 2020Issued Feb 19, 2021Finaled Jul 19, 2021 | ||||||
| 950431 | Finaled | Dec 16, 2020 | Mar 1, 2021 | Aug 17, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 16, 2020Issued Mar 1, 2021Finaled Aug 17, 2021 | ||||||
| 950474 | Finaled | Dec 16, 2020 | Mar 18, 2021 | Sep 22, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 16, 2020Issued Mar 18, 2021Finaled Sep 22, 2021 | ||||||
| 950632 | Finaled | Dec 17, 2020 | Mar 22, 2021 | Sep 24, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 17, 2020Issued Mar 22, 2021Finaled Sep 24, 2021 | ||||||
| 951164 | Finaled | Dec 24, 2020 | Jan 24, 2021 | Nov 8, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 24, 2020Issued Jan 24, 2021Finaled Nov 8, 2021 | ||||||
| 951533 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Sep 28, 2021 | $346K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #863034 Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Sep 28, 2021 | ||||||
| 951715 | Finaled | Jan 7, 2021 | Mar 23, 2021 | Nov 10, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Jan 7, 2021Issued Mar 23, 2021Finaled Nov 10, 2021 | ||||||
| 948872 | Finaled | Dec 3, 2020 | Jan 12, 2021 | May 7, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 3, 2020Issued Jan 12, 2021Finaled May 7, 2021 | ||||||
| 948934 | Finaled | Dec 3, 2020 | Jan 8, 2021 | May 14, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 3, 2020Issued Jan 8, 2021Finaled May 14, 2021 | ||||||
| 949175 | Finaled | Dec 4, 2020 | Feb 16, 2021 | Jul 15, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 4, 2020Issued Feb 16, 2021Finaled Jul 15, 2021 | ||||||
| 949798 | Finaled | Dec 13, 2020 | Feb 16, 2021 | Jul 15, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 13, 2020Issued Feb 16, 2021Finaled Jul 15, 2021 | ||||||
| 951168 | Finaled | Dec 24, 2020 | Jan 25, 2021 | Nov 19, 2021 | $357K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #863286 Front Load Submitted Dec 24, 2020Issued Jan 25, 2021Finaled Nov 19, 2021 | ||||||
| 951485 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 13, 2021 | $261K | D R HORTON Contractor |
Front Load - Construct 3-story 4-bedroom Single Family Residence Base Plan #853933 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 13, 2021 | ||||||
| 951706 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 21, 2021 | $261K | D R HORTON Contractor |
Construct 2-story 3-bedroom Single Family Residence Base Plan #853933 Front Load Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 21, 2021 | ||||||
| 951940 | Finaled | Jan 7, 2021 | Mar 29, 2021 | Nov 29, 2021 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 7, 2021Issued Mar 29, 2021Finaled Nov 29, 2021 | ||||||
| 951945 | Finaled | Jan 7, 2021 | Jan 25, 2021 | Jun 17, 2022 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Jan 7, 2021Issued Jan 25, 2021Finaled Jun 17, 2022 | ||||||
| 952102 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Jan 26, 2022 | $261K | D R HORTON Contractor |
Front Load Construct 3-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Jan 26, 2022 | ||||||
| 952107 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Jan 26, 2022 | $232K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Jan 26, 2022 | ||||||
| 949000 | Finaled | Dec 3, 2020 | Jan 8, 2021 | May 17, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 3, 2020Issued Jan 8, 2021Finaled May 17, 2021 | ||||||
| 949022 | Finaled | Dec 3, 2020 | Jan 20, 2021 | May 28, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 3, 2020Issued Jan 20, 2021Finaled May 28, 2021 | ||||||
| 949348 | Finaled | Dec 6, 2020 | Feb 17, 2021 | Jul 14, 2021 | $278K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 6, 2020Issued Feb 17, 2021Finaled Jul 14, 2021 | ||||||
| 949622 | Finaled | Dec 9, 2020 | Feb 19, 2021 | Jul 14, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 9, 2020Issued Feb 19, 2021Finaled Jul 14, 2021 | ||||||
| 949803 | Finaled | Dec 13, 2020 | Mar 22, 2021 | Oct 26, 2021 | $163K | D R HORTON Contractor |
Front Load - Construct 2-story 3-bedroom Single Family Residence Base Plan #943123 Submitted Dec 13, 2020Issued Mar 22, 2021Finaled Oct 26, 2021 | ||||||
| 949878 | Finaled | Dec 13, 2020 | Feb 10, 2021 | Jun 23, 2021 | $225K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Front Load Submitted Dec 13, 2020Issued Feb 10, 2021Finaled Jun 23, 2021 | ||||||
| 950482 | Finaled | Dec 16, 2020 | Mar 18, 2021 | Sep 10, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 16, 2020Issued Mar 18, 2021Finaled Sep 10, 2021 | ||||||
| 950643 | Finaled | Dec 17, 2020 | Mar 22, 2021 | Sep 27, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 17, 2020Issued Mar 22, 2021Finaled Sep 27, 2021 | ||||||
| 951155 | Finaled | Dec 24, 2020 | Mar 10, 2021 | Jul 30, 2021 | $225K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #914762 Submitted Dec 24, 2020Issued Mar 10, 2021Finaled Jul 30, 2021 | ||||||
| 950369 | Finaled | Dec 16, 2020 | Mar 18, 2021 | Aug 27, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 16, 2020Issued Mar 18, 2021Finaled Aug 27, 2021 | ||||||
| 948883 | Finaled | Dec 3, 2020 | Jan 14, 2021 | Jun 1, 2021 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Dec 3, 2020Issued Jan 14, 2021Finaled Jun 1, 2021 | ||||||
| 948949 | Finaled | Dec 3, 2020 | Jan 8, 2021 | May 21, 2021 | $300K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Front Load Submitted Dec 3, 2020Issued Jan 8, 2021Finaled May 21, 2021 | ||||||
| 948954 | Finaled | Dec 2, 2020 | Jan 12, 2021 | Jun 7, 2021 | $278K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 2, 2020Issued Jan 12, 2021Finaled Jun 7, 2021 | ||||||
| 949016 | Finaled | Dec 3, 2020 | Jan 25, 2021 | Nov 23, 2021 | $357K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859313 Front Load Submitted Dec 3, 2020Issued Jan 25, 2021Finaled Nov 23, 2021 | ||||||
| 949182 | Finaled | Dec 4, 2020 | Feb 9, 2021 | Jun 28, 2021 | $277K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 4, 2020Issued Feb 9, 2021Finaled Jun 28, 2021 | ||||||
| 949203 | Finaled | Dec 4, 2020 | Feb 10, 2021 | Jul 9, 2021 | $300K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859309 Submitted Dec 4, 2020Issued Feb 10, 2021Finaled Jul 9, 2021 | ||||||
| 949335 | Finaled | Dec 6, 2020 | Feb 10, 2021 | Jun 18, 2021 | $277K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Front Load Submitted Dec 6, 2020Issued Feb 10, 2021Finaled Jun 18, 2021 | ||||||
| 949629 | Finaled | Dec 9, 2020 | Mar 22, 2021 | Oct 5, 2021 | $232K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #922349 Front Load Submitted Dec 9, 2020Issued Mar 22, 2021Finaled Oct 5, 2021 | ||||||
| 949632 | Finaled | Dec 9, 2020 | Feb 10, 2021 | Jun 8, 2021 | $163K | D R HORTON Contractor |
Construct 2-story 3-bedroom Single Family Residence Base Plan #943123 Front Load Submitted Dec 9, 2020Issued Feb 10, 2021Finaled Jun 8, 2021 | ||||||
| 949832 | Finaled | Dec 13, 2020 | Jan 24, 2021 | Sep 21, 2021 | $389K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #866032 Submitted Dec 13, 2020Issued Jan 24, 2021Finaled Sep 21, 2021 | ||||||
| 949836 | Finaled | Dec 13, 2020 | Feb 22, 2021 | Aug 4, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 13, 2020Issued Feb 22, 2021Finaled Aug 4, 2021 | ||||||
| 950412 | Finaled | Dec 16, 2020 | Mar 18, 2021 | Aug 19, 2021 | $319K | D R HORTON Contractor |
Construct 2-story 5-bedroom Single Family Residence Base Plan #859311 Front Load Submitted Dec 16, 2020Issued Mar 18, 2021Finaled Aug 19, 2021 | ||||||
| 950487 | Finaled | Dec 16, 2020 | Mar 18, 2021 | Sep 10, 2021 | $332K | D R HORTON Contractor |
Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Front Load Submitted Dec 16, 2020Issued Mar 18, 2021Finaled Sep 10, 2021 | ||||||
| 950629 | Finaled | Dec 17, 2020 | Mar 22, 2021 | Sep 24, 2021 | $278K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Dec 17, 2020Issued Mar 22, 2021Finaled Sep 24, 2021 | ||||||
| 951513 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Oct 29, 2021 | $277K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #859086 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Oct 29, 2021 | ||||||
| 951544 | Finaled | Jan 7, 2021 | Mar 22, 2021 | Sep 24, 2021 | $261K | D R HORTON Contractor |
Construct 2-story 3-bedroom Single Family Residence Base Plan #853933 Submitted Jan 7, 2021Issued Mar 22, 2021Finaled Sep 24, 2021 | ||||||
| 951962 | Finaled | Jan 7, 2021 | Apr 14, 2021 | Dec 5, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 7, 2021Issued Apr 14, 2021Finaled Dec 5, 2021 | ||||||
| 952085 | Finaled | Jan 14, 2021 | Apr 15, 2021 | Dec 27, 2021 | $223K | D R HORTON Contractor |
Front Load - Construct 2-story 4-bedroom Single Family Residence Base Plan #853931 Submitted Jan 14, 2021Issued Apr 15, 2021Finaled Dec 27, 2021 | ||||||
| 952473 | Finaled | Jan 12, 2021 | Apr 16, 2021 | Mar 25, 2022 | $212K | D R HORTON Contractor |
Construct 2-story 4-bedroom Single Family Residence Base Plan #863025 Front Load Submitted Jan 12, 2021Issued Apr 16, 2021Finaled Mar 25, 2022 | ||||||
| 949843 | Finaled | Dec 13, 2020 | Mar 22, 2021 | Sep 15, 2021 | $357K | D R HORTON Contractor |
Front Load - Construct 2-story 5-bedroom Single Family Residence Base Plan #863286 Submitted Dec 13, 2020Issued Mar 22, 2021Finaled Sep 15, 2021 | ||||||
| 948851 | Finaled | Dec 2, 2020 | Jan 12, 2021 | Jun 3, 2021 | $332K | D R HORTON Contractor |
Front Load Construct 3-story 4-bedroom Single Family Residence Base Plan #859296 Submitted Dec 2, 2020Issued Jan 12, 2021Finaled Jun 3, 2021 | ||||||
Permit data from Pierce County PALS
The full record
4 sections · with ProMore about 18703 108th Av E Lot 587
- Parcel numbers, lot sizes, assessed values and zoning1 parcel
- Recorded sales of this property, with the date and price of each
- Press coveragePlusNews articles about this project, with the date of each
- ContactsProThe owner and the developer2 contacts