E20-50179, Community Homes 9, Adding an ADU to current dwelling unit, Remodel living area, Kitchen remodel new cabinets, range, countertops/sink, lighting, pantry new closet doors, new blinds, clean bathroom floors/grout, Replace existing ramp with one that runs along the house in straight line, Replace chain link fence at back of property, new gate Repairs as detailed in inspection report, Paint all rooms, Replace all flooring, create new kitchenette area in lower level.
Submitted Dec 17, 2020Issued Mar 1, 2021Finaled Jul 1, 2021
E20-50179, SFHA review, Community Homes 9, Adding and ADU to current dwelling unit, Remodel living area, Kitchen remodel new cabinets, range, countertops/sink, lighting, pantry new closet doors, new blinds, clean bathroom floors/grout, Replace existing ramp with one that runs along the house in straight line, Replace chain link fence at back of property, new gate Repairs as detailed in inspection report, Paint all rooms, Replace all flooring, create new kitchenette area in lower level.