RENOVATION - ENCLOSE CARPORT FOR ADDITION OF 407SF LAUNDRY/MUD ROOM, REMODEL BATH IN BASEMENT, EXPAND TO 288SF ENTRY WAY, REPLACE SPIRAL STAIRCASE WITH STRAIGHT STAIRS, EXISTING DECK REPLACEMENT, DECK ADDITION, PLUMB/MECH, SPRINKLERS REQUIRED. Revision 1 (10.11.24): ADD PLUMBING FOR PHASE II FUTURE ADU, APPVD 10.17.24 Revision 2 (3.31.25): Structural: SK-1 and SK-4 = Deck framing change, SK-2 & SK-3 = Entry roof redesign. Architectural: Window and sliding door header changes, Deck surface, Garage door relocated, and Footings under retaining wall revised. Revision 3 (9.22.25): Removed HVAC as that was a separate permit, added note for the plan for the flat roof to the roof plan, added note for the beam by the stairs and the engineering letter, added note about the stair construction and the engineering letter, added note about the cantilevered beam in the basement bathroom and the engineering letter.
Submitted Feb 22, 2024Issued Jul 09, 2024
Permit data from the City of Lake Stevens Citizens Connect permit portal
The full record
3 sections · with Pro
More about 325 100th Ave NE
The land and its zoningPro
Parcel numbers, lot sizes, assessed values and zoning
1 parcel
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each