PHELAN-ALBRECHT HOME Add a partial second story to an existing home. Remove 500 sf of impervious surface and convert 800 sf of lawn to native plantings. The maximum proposed building height is 23'6" (the intake form did not allow more than a single digit in the field for this information).
PHELAN-ALBRECHT-FOSTER ADU Add an exterior open metal staircase to the building to access the ADU submitted under a separate application. Entire existing structure is within the creek setback and the stair location is the furthest possible location from the creek on the property.
PHELAN-ALBRECHT ADDITION Add partial second story and remodel main level. Remove 500 sq. ft. net of impervious area. (3/26/2018 10:14 AM AA) RVN01: Creating ADU
Submitted Jul 21, 2017Issued Dec 1, 2017Finaled Dec 21, 2018
PHELAN-ALBRECHT-FOSTER ADU Create a separate ADU within the upper floor of our home. Bump out an additional 36 sq. ft. over the existing building, and extend upper roof to cover balcony. Add exterior stair, remove interior stair and supporting framework shown on approved plans.