Residence - Lot 2: *Sprinklers Required* New single residential construction. 9.16.2024_Post Rev 1 - Move garage from from level to basement level. Add stairs, and mudroom, to the basement. Add stairs to the east side exterior, revise windows. Revise upper floor bearing wall to the east, and roof pitch to 4:12 u.n.o. 11.21.2024_Post Rev 2 - Revised Bldg Height Verification Form. 1.2.2025_Post Rev 3- Revise Energy Credits.
Submitted Mar 14, 2024Issued Jul 24, 2024Finaled Jan 26, 2026