FRONT ST DUPLEX REPLACEMENT There was a duplex structure with a 44 ft by 35 ft footprint on the parcel. The duplex was destroyed during the November 2024 storm and was subsequently demolished. We only have a foundation of the old duplex. Applying for a reconstruction permit to rebuild a duplex in the existing footprint, keeping the current non-conformity, as per Issaquah IMC 18 800 080 Nonconforming Structures Restoration or Replacement
466 & 468 FRONT ST DUPLEX DEMO Demolition to existing duplex located at 466 & 488 Front St North. This structure is vacant. The structure was damaged in a storm event in late 2024 and has sustained major structural damage. The duplex is planned for reconstruction Through the use of lMC 18.214.060 A building permit for the new duplex will Follow this demolition permit application. The Proposed reconstruction will occupy the same Footprint as the existing house (potentially reusing the existing foundation), and the degree of non-conformity will not be increased. No trees are planned for removal, and trees will be protected