*CJD SFR : *Sprinklers Required* New construction of Singe Family Home, demolition of existing dwelling will be submitted separately. A separate Electrical Single Family Permit is required for PV installations. 1.9.2026 - Post- Rev 1: Revised hardscape, revised driveway/reduced sized, added gravel walkways from driveway to back patio, updated lot coverage table to reflect updated impervious surfaces, from 40% to 43% impervious surfaces.
Submitted Jul 18, 2024Issued Mar 25, 2025Finaled Jan 28, 2026