NSFR: *Sprinklers Required* Construction of a new single-family residence with a daylight basement, consisting of two stories above grade. Project includes a 584 sq. ft. attached 3-car garage, site preparation, excavation, grading, foundation, and wood-framed construction. Scope includes installation of mechanical, electrical, and plumbing systems; exterior and interior finishes; and site improvements including driveway, drainage, utilities, and landscaping. No ADU or DADU is proposed. The site does not contain critical areas. Proposed building height is 23 feet and 10 inches.
Demo: The demolition scope for this project involves the complete removal of all existing developments on the 7,250-square-foot lot to prepare the site for the construction of a new single-family residence. Specifically, the following structures and surfaces are slated to be taken down and removed: Existing Single-Family Residence: Full demolition of the existing house, which covers 1,955 square feet. Existing Driveway: Removal of the 403-square-foot asphalt driveway Outbuildings and Hardscaping: Demolition of the existing patio, outdoor steps, and a shed, which combined cover 640 square feet Rockery Wall: Removal of an existing 114-square-foot rockery wall located on the south side of the property Fencing: Removal of existing wood fencing bordering the site In total, the demolition phase will remove 3,112 square feet of existing impervious surface area from the property
Submitted May 26, 2026
Permit data from City of Kirkland
The full record
4 sections · with Pro
More about 941 20th Pl W
The land and its zoningPro
Parcel numbers, lot sizes, assessed values and zoning
1 parcel
Sales historyPro
Recorded sales of this property, with the date and price of each
Press coveragePlus
News articles about this project, with the date of each