Building 83,500 sq. ft, 3 story addition adjacent to the existing 2 story east building, with associated utilities and parking. Detention vault, Plumbing, Mechanical & Med Gas included with this permit.
LWTech Early Learning Center Classroom 1: Construction of foundations and one Factory Assembles Structure (FAS) classroom.
New 96'x60' Greenhouse. Building is V-1hr. (sprinkler sub for 1-hr construction). Added 200 ft of gas piping to permit on 8/3/00
To build a foundation and install a 35' tall granite obelisk art piece at Lake Washington Technical College outside the Restaurant in East Campus Building.
Lk WA Institute of Tech - pour one 63 SF concrete foundation located on a clear site to support 1 pre-engineered outdoor shelter
INSTALLING TEMPORARY CONSTRUCTION TRAILER
Relocate existing smoking shelter within campus. PLANS ENCLOSED.
Temporary shoring, Max 17' high soil nailing wall at Lake Washington Technical College for Phase IIIA. See BLD01-00860 for original permit.
LWTech Early Learning Center - Admin/ Office: Construction of foundations and one Factory Assembles Structure (FAS) admin/ office.
LWTech Early Learning Center - Classroom 3: Construction of foundations and one Factory Assembles Structure (FAS) classroom.
LWTech Early Learning Center - Classroom 2: Construction of foundations and one Factory Assembles Structure (FAS) classroom.
Installation of pole building. This is an out covered pole building at Vo Tech which will be a smoking (covered) area for students.
LWTech Demo - BLD S-4 (Phase 1): Selective site demolition of one existing building, utilities, playgrounds and deck.
Demolish greenhouse at Lake Washington Technical College. PLAN ENCLOSED
LWTech Demo - BLD S-7 (Phase 2): Selective site demolition of one existing building, utilities, playgrounds and deck.
Permit data from City of Kirkland