New 5 story wood multifamily building over Type 1A construction with 179 residential and 244 structured parking stalls, +4,000 SF of commercial/tenant amenities. *Plumbing, mechanical, and electrical scope of work will require separate permits* ***03/11/2022 Revisions to structural drawings approved through FRC22-0067*** ***FRC22-0090 Approved 6/2/2022 for -Clarify 8” concrete wall at P2 ramp entry. Clarify stem wall on East side of P2, Clarify C2 column callout along Grid E, Revise concrete sections through North stair, Add new opening on P1 & L1 at center stair, Clarify vehicle barrier at North and South garage ramp. Add L1 & L2 canopy sections. Clarify built-up slab extents at L1 South stair. Clarify shear wall dimension on L1 between grid 5 & 6/J. Add details for veneer conditions at L1.Add reinforcing at top of L2 courtyard slab for crack control.*** **FRC22-0099 APPROVED 06/23/2022 - Revisions to elevator, HVAC, replacing screens w/ windows at dog run, revisions to stairs, revisions to courtyard concrete levels; revised restroom, leasing office and tenant amenity spaces; eliminate elevator lobby, eliminate 1 unit and replace with common area, revised door schedule and electrical scope, revisions to parking spaces.** **FRC22-0237 (11/22/22): Field Revision to 2 hour wall assembly.** ***FRC23-0148 - 07/27/2023 - APPROVED: Substitution for gypcrete with Megaboard.*** **FRC23-0191 - 09/22/2023 APPROVED: Walls and doors are added to Garage levels P-1 and P-2 to create An elevator Lobby.** **FRC23-0248 - 03/08/2024 - APPROVED: Terrace and BBQ plans and details for the gas appliances.** **FRC23-0054 - (08/13/2024) - APPROVED: Second Floor Courtyard Canopy.** **FRC22-0180 - (08/11/2024) - APPROVED: Substitution of Rosboro X (2-Hour rated)on one beam in North Stairway for fire-treated wood. See specifications.**
Submitted Dec 30, 2019Issued Aug 24, 2021Finaled Aug 16, 2024