Construction of 480 sqft detached two car garage to be built at the same time as construction of DADU. DADU under #BLDRN22-0074 permit ***FRR23-0165 APPROVED 6/7/23: Wood framing cripple wall to be constructed to level foundation walls for construction of DADU. Framing details provided for construction of cripple walls on concrete foundation.*** Approval of step footing as constructed need. Approval of proposed cripple wall framing needed before framing to start. **FRR23-0224 (07.27.23): 5/8 diameter x 6 inch embeded wedge anchors on east and west walls**
Submitted Aug 18, 2022Issued Mar 1, 2023Finaled May 22, 2024