Construction of 480 sqft detached two car garage to be built at the same time as construction of DADU. DADU under BLDRN22-0074 permit FRR23-0165 APPROVED 6723: Wood framing cripple wall to be constructed to level foundation walls for construction of DADU. Framing details provided for construction of cripple walls on concrete foundation. Approval of step footing as constructed need. Approval of proposed cripple wall framing needed before framing to start. FRR23-0224 (07.27.23): 58 diameter x 6 inch embeded wedge anchors on east and west walls
Submitted Aug 18, 2022Issued Mar 01, 2023Finaled May 22, 2024