CONSTRUCT A 5 LEVEL RESIDENTIAL FLOORS OVER A SINGLE LEVEL STORAGE. VA CONSTRUCTION, (161) RESIDENTIAL AND LIVE / WORK UNITS. **NOTE: ALL APPROVED MECHANICAL, ELECTRICAL AND PLUMBAING WORK WILL REQUIRE SEPARATE PERMITS AND A TACOMA PUBLIC UTILITIES PERMIT FOR ELECTRICAL** ***FRC22-0236 APPROVED 2/6/23: The modification is done on level 1, moving exterior walls toward the building to support the existing retaining walls during and after construction.*** ***FRC24-0055 APPROVED 6/5/24: S29 proposed Fire Stopping material in lieu of HILTI products.***