Microsoft Refresh BLDG G (212) (13) - Construction of 5-story office building with 2 stories of partial basement. Type IIIA, primary structure is cast-in-place concrete with select areas of mass timber (dowel-laminated timber) Occupancy B on all floors. Basements are extensions to the garage and a 3-hour rated podium separates from building above. Total SF = 242,341