Kent · Green RiverKent neighborhoods Green RiverArea map · 4 locations
Construction projects in Green River, Kent
4 PROJECTS · 4 ACTIVE
4
Projects
4
Active
Projects by stage
- Land use125%
- Construction375%
What’s being built
4 active- Commercial4projects
New projects by year
Recent activity
LATEST PROJECTS- 8118 S 208 StSEPA FOR THE FOLLOWING SCOPE OF WORK: THE SUBJECT SITE IS ZONED INDUSTRIAL, I-2 MIXED USE, WHICH IS CONSISTENT WITH THE CITY OF KENT GENERAL PLAN LAND USE DESIGNATION FOR MANUFACTURING & INDUSTRIAL CENTER (MIC). HEAVY MANUFACTURING, RESEARCH & DEVELOPMENT, WAREHOUSE & DISTRIBUTION, OUTDOOR STORAGE, AND FULFILLMENT CENTERS ARE PERMITTED USES IN I-2 ZONING. THE TOTAL PROJECT AREA OF APPROXIMATELY 28 ACRES WILL BE DIVIDED INTO THREE LOTS, WITH ONE BUILDING PER LOT. THE PROJECT CONSISTS OF DEMOLITION OF FOUR OBSOLETE, NONFUNCTIONING BUILDINGS TOTALING UP TO 502,288 SQUARE FEET. CONSTRUCTION IS PROPOSED FOR TWO NEW CLASS A SPECULATIVE TYPE III-B CONCRETE TILT-UP INDUSTRIAL USE BUILDINGS TOTALING UP TO 469,530 SQUARE FEET AND EXISTING BUILDING UP TO 82,118 SQUARE FEET WILL BE RETAINED. PROPOSED IMPROVEMENTS INCLUDE GRADING, UTILITY INSTALLATION, CRITICAL AREA PRESERVATION, LANDSCAPING, AND PAVING. THE PROJECT WILL PROVIDE UP TO 655 ONSITE PASSENGER VEHICLE PARKING, AND INTERNAL CIRCULATION DRIVE AISLES/FIRE LANES. ACCESS WILL BE PROVIDED VIA TWO EXISTING DRIVEWAYS ALONG 84TH AVE SOUTH. THIS PROPOSED BINDING SITE PLAN WILL CREATE INDIVIDUAL LOTS FOR THE THREE BUILDINGS AND ASSOCIATED SITE IMPROVEMENTS. WATER AND SEWER SERVICE IS PROVIDED BY THE CITY OF KENT. THE PROJECT DESIGN IS INTENDED TO MEET THE CITY OF KENT INDUSTRIAL DESIGN STANDARDS WITH SHARED ACCESS, UTILITY AND LANDSCAPE EASEMENTS AS NEEDED FOR SHARED FACILITIES, SEE THE SEPARATE DESIGN REVIEW APPLICATION. FUTURE AND SEPARATE TENANT IMPROVEMENT PERMITS WILL ADDRESS SPECIFIC FUTURE USERS TO ENSURE ADHERE TO THE HEAVY MANUFACTURING, RESEARCH & DEVELOPMENT, WAREHOUSE & DISTRIBUTION, OUTDOOR STORAGE, AND FULFILLMENT CENTERS AS PERMITTED IN I-2 ZONING DISTRICT.
- 21838 84 Avenue SGrading and erosion control so a new warehouse can be built, including adding roads, utilities, landscaping, parking, truck areas, and systems to manage stormwater
- 7801 S 202nd StThis project will consist of redeveloping the site for construction of an approximate 178,703 square foot warehouse building on the 12.05-acre site. Along with building construction the project will include demolition of the existing industrial building previously used as an aluminum smelter, removal and cleanup of contaminated soils per Department of Ecology regulations and removal of a residential structure also located on the site. Other site improvements will include grading activities, stormwater facility, water and sanitary sewer extensions and connections, landscaping, franchise utilities and frontage road improvements along South 202nd Street and 80th Avenue South.
- 8325 S 218th StreetConstruction of less than 30,000 SF gross industrial building to accommodate uses permitted in the IG-2 Zone District.
Nearby neighborhoods
Explore all Green River projects on the map
Use BuildVue's interactive map to filter and track construction projects in Green River and across Kent.
Permit data from City of Kent